Backfill and Grading Plan You may either fill out the text box or attach a file to meet this rule(s) requirement. BACKFILL AND GRADING PLAN ATTACHMENTS Name Date Uploaded User 17.24.313(1)(d) Backfill and Grading Plan.pdf 6/12/2020 Dicki Peterson 17.24.501 General Backfilling & Grading Requirements.pdf 6/12/2020 Dicki Peterson App M Middle Impoundment Reclamation.pdf 10/3/2014 Dicki Peterson SAVAGE 17-24-504 Permanent Impoundments.pdf 9/15/2016 Dicki Peterson GENERAL LOCATION MAPS Required Map Layers: Postmine Topography (PMT) (17.24.313(1)(d)(iv)) Attachments Name Satisfied Map Layers Date Uploaded User B1 Savage Slope Histogram 2017-03 MR 56.pdf 9/9/2020 Dicki Peterson EX B Final Pit Savage PMT 2021-04 MR69.pdf Permit Boundary Postmine Drainage Basins Postmine Topography (PMT) Township, Range, Section 4/13/2021 Dicki Peterson EX_U RECLAIM XSECS LOCATIONS 2011-09.pdf 9/9/2020 Dicki Peterson EX_U1 RECLAIM XSECS 2011-09.pdf 9/9/2020 Dicki Peterson