Transportation Facilities Plan You may either fill out the text box or attach a file to meet this rule(s) requirement. Attachments Name Date Uploaded User 17.24.321 Transportation Facilities Plan.pdf 6/12/2020 Dicki Peterson 17.24.601 General Requirements for Road & Railroad Loop Construction.pdf 6/12/2020 Dicki Peterson 17.24.605 Hydrologic Impact of Roads & Railroad Loops.pdf 7/22/2020 Dicki Peterson 17.24.607 Maintenance of Roads & Railroad Loops.pdf 6/12/2020 Dicki Peterson 17.24.608 Impacts of Other Facilities.pdf 6/12/2020 Dicki Peterson 17.24.609 Other Support Facilities.pdf 6/12/2020 Dicki Peterson 17.24.610 Permanent Roads.pdf 6/12/2020 Dicki Peterson SAVAGE 17-24-602 Location of Roads & Railroad Loops.pdf 9/16/2016 Dicki Peterson SAVAGE 17-24-603 Road & Railroad Loop Embankments.pdf 9/16/2016 Dicki Peterson TRANSPORTATION FACILITIES MAP Required Map Layers: Conveyors (17.24.321(3)) Bridges (17.24.321(1)(a)) Culverts (17.24.321(1)(a)) Drainage Ditches (17.24.321(1)(a)) Drainage Structures (17.24.321(1)(a)) Intermittent Streams (17.24.321(3)) Low-Water Crossings (17.24.321(3)) Mine Plan (17.24.305(1)(d)) Perennial Streams (17.24.321(3)) Railroad Loops (17.24.321(3)) Ramps and Haul Roads (17.24.321(3)) Roads (17.24.321(3)) Attachments Name Satisfied Map Layers Date Uploaded User A1 Savage Mine Plan 2019-06 MR 65.pdf Mine Plan Permit Boundary Premine Topography Ramps and Haul Roads Roads Township, Range, Section 9/9/2020 Dicki Peterson EX_S_Savage Haulroad Certification 2012-02.pdf Roads 9/9/2020 Dicki Peterson EX_T_Facilities Area 2012-06.pdf Buildings Permit Boundary 9/9/2020 Dicki Peterson