DEQ ePermitting PUBLIC Portal

myCOAL Logo

Spring Creek Mine - C1979012 - MR262

Performance Standards 600's

601 General Requirements for Road and Railroad Loop Construction

602 Location of Roads and Railroad Loops

603 Road and Railroad Loop Embankments

605 Hydrologic Impact of Roads an Railroad Loops

607 Maintenance of Roads and Railroad Loops

608 Impacts of Other Transport Facilities

609 Other Support Facilities

610 Permanent Roads

621 General Requirements for Use of Explosives

622 Preblasting Survey

623 Blasting Schedule

624 Surface Blasting Requirements

625 Seismograph Measurements

626 Records of Blasting Operations

631 General Hydrology Requirements

632 Permanent Sealing of Drilled Holes

633 Water Quality Performance Standards

634 Reclamation of Drainage Basins

635 General Requirements for Temporary and Permanent Diversion of Overland Flow, Through Flow, Shallow Ground Water Flow, Ephemeral Drainageways, and Intermittent and Perennial Streams.

636 Special Requirements for Temporary Diversions

637 Special Requirements for Permanent Diversions

638 Sediment Control Measures

639 Sedimentation Ponds and Other Treatment Facilities

640 Discharge Structures

641 Acid-And Toxic-Forming Spoils

642 Permanent Impoundments and Flood Control Impoundments

643 Ground Water Protection

644 Protection of Ground Water Recharge

645 Ground Water Monitoring

646 Surface Water Monitoring

647 Transfer of Wells

648 Water Rights and Replacement

649 Discharge of Water into Underground Mines

650 Postmining Rehabilitation of Sedimentation Ponds, Diversions, Impoundments, and Treatment Facilities

651 Stream Channel Disurbances and Buffer Zones

652 Wells and Underground Openings: Safety

Ajax Progress Indicator