|
Solicitation Number: |
IFB CFR 1 Reach
|
Title/Description:
(Select for main document)
|
Milltown Restoration Reach CFR 1 Channel
|
|
Quote Group(s): |
|
|
Date Issued: |
01/20/2012
|
|
Closing Date | Time: |
Thu, Feb 16, 2012 | 3:00 PM (local time)
|
|
Modified Closing Date: |
NA
|
|
Issuing Agency: |
Justice
|
|
Contact: |
Doug Martin | dougmartin@mt.gov | (406) 444-0234
|
|
ARRA Funded:
|
|
|
Synopsis: |
Bids will be received for one General Contract. The Work will consist of, but is not necessarily limited to: providing all labor, materials, equipment, and incidentals necessary for mobilization, bonding and insurance; maintaining the haul road network; treating the existing and new primary haul road network; groundwater dewatering; constructing haul roads; traffic control; constructing temporary earthen berms; acquisition and delivery of materials (3,150 tons of riprap); salvaging vegetation from floodplain areas; excavating, hauling, placing and grading 21,000 CY of soil materials, constructing 800 feet of streambanks with log-brush trenches; and completing microtopography and wood placement on 7.5 acres.
|
|
Notes: |
The drawings posted below titled "CFR1 Surfaces (Zip File)" are being provided for informational purposes only. The Owner is not responsible for any errors or file problems a potential bidder may have with these files. The Owner will not provide approximate excavation and placement volumes.
|
Additional Documents: (Post Date) |
|
|
Public Meetings:
|
No Scheduled Meetings
|
|
Contract Award:
|
No Current Contract Award
|